SOURCING & OPERATIONS · LEAD TIME
How long does it take from enquiry to shipment for palm leaf plates?
Allow a few weeks for the quotation, samples and proforma, then up to 10 days for us to load the container once your 70% deposit has cleared. If we load late, 1% of the invoice is credited for each day. After that the sea voyage runs on the carrier’s schedule, which your forwarder will give you.
For buyers who need to work back from an in-store or event date to the day they must place the order.
Quick facts
- Container loading within 10 days of order confirmation and deposit, an industry first.
- Penalty of 1% of invoice value per day if the delay is on our side.
- Port of loading: New Mangalore, about 290 km by road from our Bhadravathi hub.
- Samples are free for trade buyers; you pay the courier.
What are the stages from enquiry to shipment?
There are five stages. Two of them are mostly in your hands, and they are the ones that usually decide whether the plates arrive on time.
| Stage | What happens | Time to allow |
|---|---|---|
| 1. Enquiry and quotation | You send port, mix, quantities, rim and tier. We send FOB pricing. | A few working days if the brief is complete |
| 2. Samples | Pieces of your chosen sizes go by courier on your account. You test them. | Two to three weeks, including your own testing |
| 3. Proforma and deposit | Final mix and documents agreed. You pay 70% by TT. | As fast as your bank and approvals allow |
| 4. Loading | We allocate, inspect, pack, prepare documents and load. | Up to 10 days from cleared deposit |
| 5. Sea voyage and clearance | Your forwarder’s carrier ships it; your broker clears it. | Route dependent; ask your forwarder |
On a repeat order with the same mix, stages 1 to 3 shrink to a day or two, because there is nothing new to test or agree.
What happens during the 10 days of loading?
The 10 days are split into five blocks, and several run side by side.
- Days 1 to 2, allocation. Mix, piece counts and container type confirmed, stock allocated, and any short line scheduled for pressing. You get an order acknowledgement with the countdown start time.
- Days 2 to 4, pre-shipment checks. Random samples from each lot are checked at the Bhadravathi hub for size, surface, edges and strength. A lot that fails is replaced.
- Days 4 to 6, packing. Shrink-wrapped inner packs, cartons in plain, Ecodyne or your own branding, labelled with product, batch, piece count and shipping marks.
- Days 6 to 8, documents. Invoice, packing list, certificate of origin and any phytosanitary application, prepared while packing is still going on.
- Days 8 to 10, loading. Cartons travel to New Mangalore, the container is stuffed and sealed, gated in and released for the vessel.
When does the 10-day clock start and stop?
It starts when we hold your confirmed order and the 70% deposit has cleared in our account. Not at quotation, and not on the day your bank sends the wire. It stops when the sealed container is at New Mangalore Port and released for loading onto the vessel.
The penalty covers delay on our side: a production miss, a quality rework, a packing error or a late truck we arranged. It does not cover changes you make after confirming, a late deposit, carrier delays, vessels rolled to a later sailing, strikes, weather or clearance at your end. Those belong to your carrier contract and your Incoterm.
What can the buyer do to keep the timeline on track?
We need three things from you during loading. Shipping marks by day 3, your forwarder’s nomination by day 5, and bill of lading details by day 8. If one of them is late, the clock pauses for that time and the penalty does not run.
The bigger delays happen before loading. An enquiry that says “a quote for some plates” costs a round of emails. So does a country with no named port, or silence on which documents your customs or retail buyer needs. Put all of that in the first message. If you sell under your own brand, have the artwork ready by day 3 so packing on day 4 is not held up.
My advice is to lock the mix before you send the purchase order. A change halfway through loading means re-allocating stock, and that is the one thing that can push a container past day 10.
How long is the sea voyage from India?
That depends on your port, the carrier and whether the service transships. Gulf ports are close; Europe, North America, Australia and New Zealand take noticeably longer. Your forwarder will give you a sailing schedule for New Mangalore, and FOB Mumbai is possible at extra haulage cost if your carrier calls there instead. Under FOB the risk passes to you once the goods are on board, so your cargo insurance should start from that moment.
Our wholesale terms page lists the ports we ship to most often. For a first order, add a margin for clearance at destination, especially if your customs authority has not seen palm leaf tableware from you before.
Can the timeline be shortened for an urgent order?
The loading window is already short. The time you can actually save comes earlier: skip a second round of samples if you already know the product, and send a complete brief so the proforma goes out first time.
What cannot be shortened is the voyage. If your event date is close, choose a port with a direct service and talk to your forwarder before you pay the deposit, not after. The import steps guide shows the full order sequence.
Questions buyers ask
Does the 1% penalty cover delays at sea?
No. It covers the loading window only, from cleared deposit to the sealed container released at New Mangalore Port. Carrier delays, transhipment and destination clearance sit outside it, because we do not control them.
Does supply stop during the monsoon?
No. Areca sheaths fall in commercial volumes from November to May. We stock up on raw material and finished goods in that season so the 10-day loading holds from June to October as well.
When do I receive the shipping documents?
Once the container is loaded and the bill of lading is issued, we email copies of the full set. You pay the 30% balance against them, and the original bill of lading is couriered to you or your bank once the funds have cleared.
Does white label take longer than our own brand?
Not if the artwork is ready. White label needs one 40ft high cube, and we need your final artwork and shipping marks by day 3 of the loading window. Late artwork pauses the clock until it arrives.
What is the minimum order for a container?
One 20ft container for the Ecodyne Tableware brand, or one 40ft high cube for white label. Mixed sizes are allowed, with at least 200 cartons per product category.
Sources
Tell us the date the plates must be in your warehouse, and we will work back from it with you.
Request a Quote
Wholesale palm leaf tableware, FOB New Mangalore Port. Share your monthly volumes and SKUs.
Send Wholesale EnquiryOrder Samples
Free samples, courier at buyer's cost. Tell us which sizes to evaluate.
Send Sample RequestContainer Calculator